Remodeling Continues

Today was somewhat of a busy day. The weather kept us indoors.

I wish I could say that the tip out was completely finished. We still have one wall that needs to be done.The entire room needs to be painted. We have about half a gallon of white paint. We went to Walmart to see if they had paint and they did. The price of paint went up since we last bought some. While we were there, I checked out rugs for my room. They didn’t have any that would fit the room perfectly.My room is roughly 6.5 by 9.5. The room is small but that’s okay because it will make me think about what I really want in the space.

The door entering my area still needs to be finished, trim still needs to be added. One wall has drywall on it. The drywall is different sizes, we used what we had left over so we didn’t have to spend money we didn’t have. We have a type of ship lap so that will be used on the other wall. We are using what we have to get this project finished. It might not be all that pretty and perfect but I’m okay with the imperfections.

Things have been at a snails pace here lately. I had a really bad Sinus cold, this weather is flaky. It’s suppose to be 70 degrees and rain then at night it’s suppose to be below freezing. We still have to finish my area , move some furniture around.Trying to get our home to look like a home instead of a construction zone.

Hope everyone is doing well.

Thanks for stopping by.

Til next time

3 thoughts on “Remodeling Continues

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s